Sewer Line Inspection

July 25, 2025 3:43 pm

Project Schedule:

Monday, July 28th – Friday, August 1st

Streets Impacted:

  • Chestergate Drive
  • Cimber Lane
  • Birnam Wood Boulevard
  • Wintergate Drive
  • Hickorygate Drive

Equix Integrity SE is a contractor hired by the Harris County MUD No. 43 to perform sewer work in your area. We will be working on and off residents’ properties from the hours of: 7:00 am to 5:00pm.

To complete this work, we could possibly need access to sewer manholes that may be in your front or back yard. There will be different kinds of vehicles on site from Equix, a CCTV Camera truck and a Large Jet/Vac Combo Truck or a regular pickup truck. The combo truck is a rather large vehicle and will be making semi-loud noises as we clean and vacuum sewer lines. As we clean these sewer lines there might be strong odors that will come up from your toilets or drains. This is normal and should clear shortly. However, we do ask that you keep your toilet seats down to minimize the smell and to open your cleanouts to reduce the pressure in your laterals.

Dark ModeLight Mode